Process  Description Typical Size Range Tolerances Surface Finish Min. Draft Required Min. Section Thickness Typical Order Quantities Typical Tooling Costs Nominal Lead Times
V-PROCESS Castings Extremely fine sand is 'vacuum packed' around pattern halves. The pattern is removed and metal poured into cavity. The vacuum is released and the casting removed. Up to 150 lbs ± .010" for the first 1", then add
± .002" per inch.
Add a maximum .020"
across parting line
125-150 RMS None .125" All $3,000 to $14,000 Samples: 2 to 6 weeks Production: 2 to 6 weeks after approval
Sand Castings Treated sand is molded around a wood or metal pattern. The mold halves are opened and the pattern removed. Metal is poured into the cavity. The mold is broken and the casting removed. Ounces to tons ± 1/32" to 6", then add
± .003" per inch.
Add ±.020" to .090"
across parting line
200-550 RMS 1 to 5 degrees .25" All $800 to $4,000 Samples: 2 to 6 weeks Production: 2 to 6 weeks after approval
Investment (Lost Wax) A metal mold makes wax replicas. These are joined and surrounded by an investment material. Wax is melted out and metal is poured into the cavity. The molds are broken and the casting removed. Ounces to 20 lbs ± .003" to 1/4"
± .004" to 1/2"
± .005" to 3", then add
± .003" per inch
63-125 RMS None .060" Under 1000 $3,000 to $20,000 Samples: 8 to 10 weeks Production: 5 to 12 weeks after approval
Permanent Mold Molten metal is poured into a steel mold. The mold is opened and the casting is ejected. Ounces to 100 lbs ± .015" to 1", then add
± .002" per inch.
Add ±.010" to .030"
across parting line
150-300 RMS 2 to 5 degrees .1875" 500+ $5,000 to $25,000 Samples: 8 to 20 weeks Production: 10 to 12 weeks after approval
Plaster Mold A plaster slurry is poured into the pattern halves. After setting, the mold is removed from pattern, baked, assembled and metal poured into the cavity. The mold is broken and the casting removed. Ounces to 50 lbs ± .005" to 2", then add
± .002" per inch.
Add ±.010"
across parting line
63-125 RMS 1/2 to 2 degrees .070" Prototypes up to 250 pcs $3,000 to $15,000 Samples: 2 to 10 weeks Production: 4 to 8 weeks after approval
Die Casting Steel dies, sometimes water cooled, are filled with molten aluminum. The metal solidifies, the die is opened and the casting ejected. Ounces to 15 lbs ± .002" per inch.
Add ±.015"
across parting line
32-63 RMS 1 to 3 degrees .030" to .060" 2500+ $10,000 to $100,000 Samples: 12 to 22 weeks Production: 8 to 14 weeks after approval